Line 2AMumbai Metro · MMRDA

Yellow Line

Dahisar EastD.N. Nagar · Western suburbs corridor from Dahisar East to D.N. Nagar. Interchanges with the Red Line at Dahisar East and the Blue Line at D.N. Nagar.

17
Estações
18.6 km
Comprimento total
2022
Ano de abertura
~42 min
Tempo total
Planejar uma rota nesta linha

17 estações

Dahisar EastTerminal
⬆ ELZ1+0 min
Dahisar Check Naka · Dahisar Check Naka · Dahisar Check Naka
2.6 min · 1.2 km
Anand Nagar
⬆ ELZ1+2.6 min
2.6 min · 1.2 km
Rushi Sankul
⬆ ELZ1+5.2 min
2.6 min · 1.2 km
IC Colony
⬆ ELZ1+7.8 min
2.6 min · 1.2 km
Eksar
⬆ ELZ1+10.4 min
2.6 min · 1.2 km
2.6 min · 1.2 km
Shimpoli
⬆ ELZ1+15.6 min
2.6 min · 1.2 km
Mahavir Nagar
⬆ ELZ1+18.2 min
2.6 min · 1.2 km
Kamraj Nagar
⬆ ELZ1+20.8 min
2.6 min · 1.2 km
Charkop
⬆ ELZ1+23.4 min
2.6 min · 1.2 km
Malad West
⬆ ELZ1+26 min
2.6 min · 1.2 km
Kasturba Chowk
⬆ ELZ1+28.6 min
2.6 min · 1.2 km
Bangur Nagar
⬆ ELZ1+31.2 min
2.6 min · 1.2 km
Goregaon West
⬆ ELZ1+33.8 min
2.6 min · 1.2 km
Oshiwara
⬆ ELZ1+36.4 min
2.6 min · 1.2 km
Lower Oshiwara
⬆ ELZ1+39 min
2.6 min · 1.2 km
D.N. NagarTerminal
⬆ ELZ1+41.6 min
DN Nagar · Andheri West · DN Nagar

Sobre Yellow Line

A Yellow Line (Line 2A) percorre 18.6 km de Dahisar East a D.N. Nagar, servindo 17 estações. Western suburbs corridor from Dahisar East to D.N. Nagar. Interchanges with the Red Line at Dahisar East and the Blue Line at D.N. Nagar.

A linha foi inaugurada em 2022. Uma viagem completa leva cerca de 42 minutos. Das 17 estações, 0 são subterrâneas e 17 elevadas, com 2 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Yellow Line num relance

Número da linhaLine 2A
Estações17
Comprimento18.6 km
Aberta2022-04-02
TipoBitola padrão
Eletrificação25 kV AC overhead
Passageiros diários200,000
FaseFase 2

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador
Metrô de Mumbai Yellow Line — All 17 Stations, Map & Route Guide | MetroFare