14 estações
Dahisar EastTerminal
⬆ ELZ1+0 min
Dahisar Check Naka · Dahisar Check Naka · Dahisar Check Naka
2.8 min · 1.3 km
Ovaripada
⬆ ELZ1+2.8 min
2.8 min · 1.3 km
Rashtriya Udyan
⬆ ELZ1+5.6 min
2.8 min · 1.3 km
Devipada
⬆ ELZ1+8.4 min
2.8 min · 1.3 km
Magathane
⬆ ELZ1+11.2 min
2.8 min · 1.3 km
Poisar
⬆ ELZ1+14 min
2.8 min · 1.3 km
Akurli
⬆ ELZ1+16.8 min
2.8 min · 1.3 km
Kurar
⬆ ELZ1+19.6 min
2.8 min · 1.3 km
Dindoshi
⬆ ELZ1+22.4 min
2.8 min · 1.3 km
Aarey
⬆ ELZ1+25.2 min
2.8 min · 1.3 km
Goregaon East
⬆ ELZ1+28 min
2.8 min · 1.3 km
Jogeshwari East
⬆ ELZ1+30.8 min
2.8 min · 1.3 km
Mogra
⬆ ELZ1+33.6 min
Sobre Red Line
A Red Line (Line 7) percorre 16.5 km de Dahisar East a Gundavali, servindo 14 estações. Western Express Highway corridor from Dahisar East to Gundavali (Andheri East). Interchanges with the Yellow Line at Dahisar East and connects to the Blue Line near Andheri.
A linha foi inaugurada em 2022. Uma viagem completa leva cerca de 36 minutos. Das 14 estações, 0 são subterrâneas e 14 elevadas, com 1 estação(ões) de baldeação ligando à rede.
Perguntas frequentes
Red Line num relance
Número da linhaLine 7
Estações14
Comprimento16.5 km
Aberta2022-04-02
TipoBitola padrão
Eletrificação25 kV AC overhead
Passageiros diários180,000
FaseFase 2
Planeje sua viagem
Encontre a melhor rota em todas as linhas