16 estações
XilangTerminal
⬇ UGZ1+0 min
Xilang area · Xilang area
2.7 min · 1.2 km
Kengkou
⬇ UGZ1+2.7 min
2.8 min · 1.2 km
Huadiwan
⬇ UGZ1+5.5 min
2.7 min · 1.2 km
Fangcun
⬇ UGZ1+8.2 min
2.7 min · 1.2 km
Huangsha
⬇ UGZ1+10.9 min
2.8 min · 1.2 km
Changshou Road
⬇ UGZ1+13.7 min
2.7 min · 1.2 km
Chen Clan Academy
⬇ UGZ1+16.4 min
2.7 min · 1.2 km
Ximenkou
⬇ UGZ1+19.1 min
2.7 min · 1.2 km
Nongjiangsuo
⬇ UGZ1+24.6 min
2.7 min · 1.2 km
Martyrs' Park
⬇ UGZ1+27.3 min
2.8 min · 1.2 km
Dongshankou
⬇ UGZ1+30.1 min
2.7 min · 1.2 km
Yangji
⬇ UGZ1+32.8 min
2.7 min · 1.2 km
Tiyu Xilu
⬇ UGZ1+35.5 min
Tianhe Sports Center · Tianhe Sports Center · Tianhe Sports Center
2.8 min · 1.2 km
Tianhe Sports Center
⬇ UGZ1+38.3 min
2.7 min · 1.2 km
Guangzhou East Railway StationTerminal
⬇ UGZ1+41 min
Guangzhou East Railway Station · Guangzhou East Railway Station
Sobre Line 1
A Line 1 (Line 1) percorre 18.5 km de Xilang a Guangzhou East Railway Station, servindo 16 estações. Line 1 of the Guangzhou Metro.
A linha foi inaugurada em 1997. Uma viagem completa leva cerca de 41 minutos. Das 16 estações, 16 são subterrâneas e 0 elevadas, com 2 estação(ões) de baldeação ligando à rede.
Perguntas frequentes
Line 1 num relance
Número da linhaLine 1
Estações16
Comprimento18.5 km
Aberta1997-06-28
TipoBitola padrão
Eletrificação750 V DC third rail / 1.5 kV DC overhead
Passageiros diários900,000
FaseFase 1
Planeje sua viagem
Encontre a melhor rota em todas as linhas