Line 3Guangzhou Metro · GZMTR

Line 3

Airport NorthKecun · Line 3 of the Guangzhou Metro.

14
Estações
28 km
Comprimento total
2005
Ano de abertura
~57 min
Tempo total
Planejar uma rota nesta linha

14 estações

Airport NorthTerminal
⬇ UGZ1+0 min
Baiyun Airport T2 · Baiyun Airport T2
4.4 min · 2.1 km
Airport South
⬇ UGZ1+4.4 min
4.4 min · 2.2 km
Renhe
⬇ UGZ1+8.8 min
4.4 min · 2.2 km
Longgui
⬇ UGZ1+13.2 min
4.4 min · 2.2 km
Jiahewanggang
⬇ UGZ1+17.6 min
Jiahewanggang · Jiahewanggang · Jiahewanggang
4.4 min · 2.2 km
Baiyun Avenue North
⬇ UGZ1+22 min
4.4 min · 2.2 km
Tonghe
⬇ UGZ1+26.4 min
4.4 min · 2.2 km
Yongtai
⬇ UGZ1+30.8 min
4.4 min · 2.2 km
Tianhe Coach Terminal
⬇ UGZ1+35.2 min
4.4 min · 2.1 km
Linhexi
⬇ UGZ1+39.6 min
4.4 min · 2.2 km
Tiyu Xilu
⬇ UGZ1+44 min
Tianhe Sports Center · Tianhe Sports Center · Tianhe Sports Center
4.4 min · 2.2 km
Shipaiqiao
⬇ UGZ1+48.4 min
4.4 min · 2.2 km
Gangding
⬇ UGZ1+52.8 min
4.4 min · 2.1 km
KecunTerminal
⬇ UGZ1+57.2 min
Kecun area · Kecun area

Sobre Line 3

A Line 3 (Line 3) percorre 28 km de Airport North a Kecun, servindo 14 estações. Line 3 of the Guangzhou Metro.

A linha foi inaugurada em 2005. Uma viagem completa leva cerca de 57 minutos. Das 14 estações, 14 são subterrâneas e 0 elevadas, com 2 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Line 3 num relance

Número da linhaLine 3
Estações14
Comprimento28 km
Aberta2005-12-26
TipoBitola padrão
Eletrificação750 V DC third rail / 1.5 kV DC overhead
Passageiros diários1,300,000
FaseFase 1

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador
Metrô de Cantão Line 3 — All 14 Stations, Map & Route Guide | MetroFare