Bedok 到达 Dhoby Ghaut
ShortestShortest Route
Bedok
站台 1·elevated·East-West Line开往 Tuas Link
首班车: 05:00末班车: 23:00Doors open: right
Paya Lebar
+5.75 分钟orange 换乘
5.75 分钟 · 2.89 km
Aljunied
+11.49 分钟5.74 分钟 · 2.88 km
Bugis
+17.23 分钟blue 换乘
5.74 分钟 · 2.88 km
City Hall
red 换乘
Arrive Platform 3·underground11.53 km
首班车: 05:30末班车: 00:00
换乘站 City Hall — 5 分钟
站台 3 · North-South Line ·站台 1 开往 Jurong East
City Hall
green 换乘
站台 1·underground·North-South Line开往 Jurong East
首班车: 05:30末班车: 00:00Doors open: right
Dhoby Ghaut
purple 换乘orange 换乘
Arrive Platform 1·underground2.59 km
首班车: 05:30末班车: 00:00
Route on the map
5站1换乘
出发到达
行程概览
33 分钟
Total time
5
站
14.12 km
Distance
1
Interchanges
首末班车
| Station | 首班车 | 末班车 |
|---|---|---|
| Bedok | 05:00 | 23:00 |
| Dhoby Ghaut | 05:30 | 00:00 |
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).
票价与智能卡
Token fare
S$2.11
Buy at counter or TVM
智能卡
S$2.01
Save S$0.1 per ride
Off-peak smart card
S$2.01
Save S$0.1 per ride
Use your Singapore MRT smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guideAdvertisement
绿色出行
1.91 kg
CO₂ saved
vs driving a car
0.88 L
Fuel saved
petrol equivalent
~56 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform
费用对比
Metro
S$2.11
Bike
S$94
Auto
S$200
Cab
S$360
Estimates for 14.12 km. Metro is fare-per-person; auto/cab can be shared.
常见问题
热门路线
Departure station
Bedok
Bedok, Singapore
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 1 · 2 entry points
设施
LiftsEscalatorsToiletsDrinking water
Arrival station
Dhoby Ghaut
Dhoby Ghaut, Singapore
Weekdays: 05:30 – 00:00(Sundays from 05:30)
Zone 1 · 4 entry points
Key exits
1
Dhoby Ghaut exit A· Plaza Singapura♿
2
Dhoby Ghaut exit B· Plaza Singapura♿
3
Dhoby Ghaut exit C· Plaza Singapura♿
4
Dhoby Ghaut exit D· Plaza Singapura♿
Tap in and out with an EZ-Link or SimplyGo card; eating and drinking are not allowed on trains.
设施
LiftsEscalatorsToiletsDrinking waterATMConvenience store
Advertisement