CSMIA Terminal 1Siddhivinayak
20 分钟7 ₹20Mumbai Metro
规划路线

CSMIA Terminal 1 到达 Siddhivinayak

ShortestShortest Route
CSMIA Terminal 1
站台 2·underground·Aqua Line开往 Cuffe Parade
首班车: 05:00末班车: 23:00Doors open: right
Santacruz Metro
+2.85 分钟
2.85 分钟 · 1.29 km
Vidyanagari
+5.7 分钟
2.85 分钟 · 1.29 km
Shitladevi
+14.23 分钟
2.85 分钟 · 1.29 km
Dadar Metro
+17.08 分钟
2.85 分钟 · 1.29 km
Siddhivinayak
Arrive Platform 2·underground9.02 km
首班车: 05:00末班车: 23:00

Route on the map

70换乘
BSiddhivinayakDadar MetroShitladeviDharaviBandra Kurla ComplexVidyanagariSantacruz MetroACSMIA Terminal 1
出发到达

行程概览

20 分钟
Total time
7
9.02 km
Distance
0
Interchanges

首末班车

Station首班车末班车
CSMIA Terminal 105:0023:00
Siddhivinayak05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

票价与智能卡

Token fare
20
Buy at counter or TVM
智能卡
18
Save ₹2 per ride
Off-peak smart card
18
Save ₹2 per ride
Use your Mumbai Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

绿色出行

1.22 kg
CO₂ saved
vs driving a car
0.56 L
Fuel saved
petrol equivalent
~36 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

费用对比

Metro
₹20
Bike
₹64
Auto
₹138
Cab
₹248

Estimates for 9.02 km. Metro is fare-per-person; auto/cab can be shared.

常见问题

热门路线

Departure station

CSMIA Terminal 1

underground
CSMIA Terminal 1, Mumbai, Maharashtra
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 2 entry points
设施
LiftsEscalatorsToiletsDrinking water
Arrival station

Siddhivinayak

underground
Siddhivinayak, Mumbai, Maharashtra
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 2 entry points
设施
LiftsEscalatorsToiletsDrinking water

Advertisement

CSMIA Terminal 1 to Siddhivinayak Metro — 7 stops, 20 min, ₹20 | MetroFare