GoraguntepalyaMadavara
20 分钟8 ₹37Bengaluru Metro
规划路线

Goraguntepalya 到达 Madavara

ShortestShortest Route
Goraguntepalya
站台 2·elevated·Green Line开往 Madavara
首班车: 05:00末班车: 23:00Doors open: right
Peenya
orange 换乘
+2.45 分钟
2.45 分钟 · 1.07 km
Peenya Industry
+4.91 分钟
2.46 分钟 · 1.08 km
Manjunathanagara
+14.75 分钟
2.46 分钟 · 1.08 km
Chikkabidarakallu
+17.21 分钟
2.46 分钟 · 1.08 km
Madavara
Arrive Platform 2·elevated8.63 km
首班车: 05:00末班车: 23:00

Route on the map

80换乘
BMadavaraChikkabidarakalluManjunathanagaraNagasandraDasarahalliJalahalliPeenya IndustryPeenyaAGoraguntepalya
出发到达

行程概览

20 分钟
Total time
8
8.63 km
Distance
0
Interchanges

首末班车

Station首班车末班车
Goraguntepalya05:0023:00
Madavara05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

票价与智能卡

Token fare
37
Buy at counter or TVM
智能卡
35
Save ₹2 per ride
Off-peak smart card
35
Save ₹2 per ride
Use your Bengaluru Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

绿色出行

1.17 kg
CO₂ saved
vs driving a car
0.54 L
Fuel saved
petrol equivalent
~35 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

费用对比

Metro
₹37
Bike
₹62
Auto
₹134
Cab
₹240

Estimates for 8.63 km. Metro is fare-per-person; auto/cab can be shared.

常见问题

热门路线

Departure station

Goraguntepalya

elevated
Goraguntepalya, Bengaluru, Karnataka
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 3 entry points
设施
LiftsEscalatorsToiletsDrinking water
Arrival station

Madavara

elevated
Madavara, Bengaluru, Karnataka
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 3 entry points
Green Line terminal station.
设施
LiftsEscalatorsToiletsDrinking water

Advertisement

Goraguntepalya to Madavara Metro — 8 stops, 20 min, ₹37 | MetroFare