Line 2Nagpur Metro · MahaMetro

Aqua Line

Prajapati NagarLokmanya Nagar · Aqua Line of the Nagpur Metro.

20
Estações
18.65 km
Comprimento total
2019
Ano de abertura
~44 min
Tempo total
Planejar uma rota nesta linha

20 estações

Prajapati Nagar · Prajapati Nagar
2.3 min · 1.0 km
Vaishno Devi Square
⬆ ELZ1+2.3 min
2.3 min · 1.0 km
Ambedkar Square
⬆ ELZ1+4.6 min
2.3 min · 1.0 km
2.3 min · 1.0 km
Chitar Oli Square
⬆ ELZ1+9.2 min
2.3 min · 1.0 km
Agrasen Square
⬆ ELZ1+11.5 min
2.3 min · 1.0 km
Dosar Vaishya Square
⬆ ELZ1+13.8 min
2.3 min · 1.0 km
Nagpur Railway Station
⬆ ELZ1+16.1 min
2.3 min · 1.0 km
Cotton Market
⬆ ELZ1+18.4 min
2.3 min · 1.0 km
Sitabuldi
⬆ ELZ1+20.7 min
Sitabuldi Main Road · Sitabuldi Main Road · Sitabuldi Main Road
2.3 min · 1.0 km
Jhansi Rani Square
⬆ ELZ1+23 min
2.3 min · 1.0 km
Institution of Engineers
⬆ ELZ1+25.3 min
2.3 min · 1.0 km
Shankar Nagar Square
⬆ ELZ1+27.6 min
2.3 min · 1.0 km
LAD Square
⬆ ELZ1+29.9 min
2.3 min · 1.0 km
Dharampeth College
⬆ ELZ1+32.2 min

Sobre Aqua Line

A Aqua Line (Line 2) percorre 18.65 km de Prajapati Nagar a Lokmanya Nagar, servindo 20 estações. Aqua Line of the Nagpur Metro.

A linha foi inaugurada em 2019. Uma viagem completa leva cerca de 44 minutos. Das 20 estações, 0 são subterrâneas e 20 elevadas, com 1 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Aqua Line num relance

Número da linhaLine 2
Estações20
Comprimento18.65 km
Aberta2019-09-28
TipoBitola padrão
Eletrificação25 kV AC overhead
Passageiros diários55,000
FaseFase 1

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador
Metrô de Nagpur Aqua Line — All 20 Stations, Map & Route Guide | MetroFare