Line 3Kolkata Metro · Metro Railway

Purple Line

JokaMajerhat · Joka–Esplanade corridor, currently operational between Joka and Majerhat in the south-west of the city.

7
Estações
8 km
Comprimento total
2022
Ano de abertura
~17 min
Tempo total
Planejar uma rota nesta linha

7 estações

JokaTerminal
⬆ ELZ1+0 min
Joka · Joka
2.9 min · 1.3 km
Thakurpukur
⬆ ELZ1+2.9 min
2.9 min · 1.3 km
Sakherbazar
⬆ ELZ1+5.8 min
2.9 min · 1.3 km
Behala Chowrasta
⬆ ELZ1+8.7 min
2.9 min · 1.3 km
Behala Bazar
⬆ ELZ1+11.6 min
2.9 min · 1.3 km
Taratala
⬆ ELZ1+14.5 min
2.9 min · 1.3 km
MajerhatTerminal
⬆ ELZ1+17.4 min
Majerhat Railway Station · Majerhat Railway Station

Sobre Purple Line

A Purple Line (Line 3) percorre 8 km de Joka a Majerhat, servindo 7 estações. Joka–Esplanade corridor, currently operational between Joka and Majerhat in the south-west of the city.

A linha foi inaugurada em 2022. Uma viagem completa leva cerca de 17 minutos. Das 7 estações, 0 são subterrâneas e 7 elevadas, com 0 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Purple Line num relance

Número da linhaLine 3
Estações7
Comprimento8 km
Aberta2022-12-30
Tipobroad
Eletrificação750 V DC third rail
Passageiros diários20,000
FaseFase 1

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador
Metrô de Calcutá Purple Line — All 7 Stations, Map & Route Guide | MetroFare