Line 1Hyderabad Metro · HMRL

Red Line

MiyapurLB Nagar · North-south corridor from Miyapur to LB Nagar through Ameerpet and the city centre. Interchanges with the Blue Line at Ameerpet and the Green Line at MG Bus Station.

27
Estações
29.21 km
Comprimento total
2017
Ano de abertura
~66 min
Tempo total
Planejar uma rota nesta linha

27 estações

MiyapurTerminal
⬆ ELZ1+0 min
Miyapur Bus Depot · Miyapur Bus Depot
2.5 min · 1.1 km
JNTU College
⬆ ELZ1+2.5 min
2.6 min · 1.1 km
KPHB Colony
⬆ ELZ1+5.1 min
2.5 min · 1.1 km
Kukatpally
⬆ ELZ1+7.6 min
2.5 min · 1.1 km
2.6 min · 1.1 km
Moosapet
⬆ ELZ1+12.7 min
2.5 min · 1.1 km
Bharat Nagar
⬆ ELZ1+15.2 min
2.5 min · 1.1 km
Erragadda
⬆ ELZ1+17.7 min
2.6 min · 1.1 km
ESI Hospital
⬆ ELZ1+20.3 min
2.5 min · 1.1 km
S.R. Nagar
⬆ ELZ1+22.8 min
2.5 min · 1.1 km
Ameerpet
⬆ ELZ1+25.3 min
Ameerpet · Maitrivanam · Ameerpet
2.6 min · 1.1 km
Punjagutta
⬆ ELZ1+27.9 min
2.5 min · 1.1 km
Irrum Manzil
⬆ ELZ1+30.4 min
2.6 min · 1.1 km
Khairatabad
⬆ ELZ1+33 min
2.5 min · 1.1 km
Lakdikapul
⬆ ELZ1+35.5 min

Sobre Red Line

A Red Line (Line 1) percorre 29.21 km de Miyapur a LB Nagar, servindo 27 estações. North-south corridor from Miyapur to LB Nagar through Ameerpet and the city centre. Interchanges with the Blue Line at Ameerpet and the Green Line at MG Bus Station.

A linha foi inaugurada em 2017. Uma viagem completa leva cerca de 66 minutos. Das 27 estações, 0 são subterrâneas e 27 elevadas, com 2 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Red Line num relance

Número da linhaLine 1
Estações27
Comprimento29.21 km
Aberta2017-11-29
TipoBitola padrão
Eletrificação25 kV AC overhead
Passageiros diários300,000
FaseFase 1

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador
Metrô de Hyderabad Red Line — All 27 Stations, Map & Route Guide | MetroFare