Bhikaji Cama PlaceSouth Extension
8 min3 paradas₹20Delhi Metro
Planejar rota

Bhikaji Cama Place Para South Extension

ShortestShortest Route
Bhikaji Cama Place
Plataforma 2·underground·Pink LineSentido Shiv Vihar
Primeiro trem: 06:00Último trem: 23:00Doors open: right
Sarojini Nagar
+2.61 min
2.61 min · 1.16 km
INA
yellow baldeação
+5.07 min
2.46 min · 1.08 km
South Extension
Arrive Platform 2·underground3.58 km
Primeiro trem: 06:00Último trem: 23:00

Route on the map

3paradas0baldeações
INAABhikaji Cama PlaceSarojini NagarBSouth Extension
DePara

Viagem num relance

8 min
Total time
3
paradas
3.58 km
Distance
0
Interchanges

Primeiro e último trem

StationPrimeiro tremÚltimo trem
Bhikaji Cama Place06:0023:00
South Extension06:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

Tarifas e cartão

Token fare
20
Buy at counter or TVM
Cartão inteligente
18
Save ₹2 per ride
Off-peak smart card
16
Save ₹4 per ride
Use your Delhi Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

Viagem verde

0.48 kg
CO₂ saved
vs driving a car
0.22 L
Fuel saved
petrol equivalent
~14 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

Comparação de custos

Metro
₹20
Bike
₹32
Auto
₹72
Cab
₹128

Estimates for 3.58 km. Metro is fare-per-person; auto/cab can be shared.

Perguntas frequentes

Rotas populares

Departure station

Bhikaji Cama Place

underground
Weekdays: 06:0023:00(Sundays from 06:00)
Zone 1 · 5 entry points
Instalações
LiftsEscalatorsToiletsATMDrinking water
Arrival station

South Extension

underground
Weekdays: 06:0023:00(Sundays from 06:00)
Zone 1 · 4 entry points
Instalações
LiftsEscalatorsToiletsDrinking water

Advertisement

Bhikaji Cama Place to South Extension Metro — 3 stops, 8 min, ₹20 | MetroFare