Line 5Beijing Subway · BJMTR

Line 5

Tiantongyuan NorthSongjiazhuang · Line 5 of the Beijing Subway.

16
Estações
27.6 km
Comprimento total
2007
Ano de abertura
~57 min
Tempo total
Planejar uma rota nesta linha

16 estações

Tiantongyuan · Tiantongyuan
3.8 min · 1.8 km
Tiantongyuan
⬆ ELZ1+3.8 min
3.8 min · 1.8 km
Lishuiqiao
⬆ ELZ1+7.6 min
3.8 min · 1.8 km
Datunlu East
⬇ UGZ1+11.4 min
3.8 min · 1.8 km
Huixinxijie Nankou
⬇ UGZ1+15.2 min
3.8 min · 1.8 km
Yonghegong
⬇ UGZ1+19 min
Lama Temple · Lama Temple · Lama Temple
3.8 min · 1.8 km
Beixinqiao
⬇ UGZ1+22.8 min
3.8 min · 1.8 km
Zhangzizhonglu
⬇ UGZ1+26.6 min
3.8 min · 1.8 km
Dongsi
⬇ UGZ1+30.4 min
3.8 min · 1.8 km
Dengshikou
⬇ UGZ1+34.2 min
3.8 min · 1.8 km
Dongdan
⬇ UGZ1+38 min
Dongdan · Dongdan · Dongdan
3.8 min · 1.8 km
Chongwenmen
⬇ UGZ1+41.8 min
Chongwenmen area · Chongwenmen area · Chongwenmen area
3.8 min · 1.8 km
Ciqikou
⬇ UGZ1+45.6 min
3.8 min · 1.8 km
Tiantandongmen
⬇ UGZ1+49.4 min
3.8 min · 1.8 km
Puhuangyu
⬇ UGZ1+53.2 min
3.8 min · 1.8 km
SongjiazhuangTerminal
⬇ UGZ1+57 min
Songjiazhuang area · Songjiazhuang area

Sobre Line 5

A Line 5 (Line 5) percorre 27.6 km de Tiantongyuan North a Songjiazhuang, servindo 16 estações. Line 5 of the Beijing Subway.

A linha foi inaugurada em 2007. Uma viagem completa leva cerca de 57 minutos. Das 16 estações, 13 são subterrâneas e 3 elevadas, com 3 estação(ões) de baldeação ligando à rede.

Perguntas frequentes

Line 5 num relance

Número da linhaLine 5
Estações16
Comprimento27.6 km
Aberta2007-10-07
TipoBitola padrão
Eletrificação750 V DC third rail / 1.5 kV DC overhead
Passageiros diários900,000
FaseFase 1

Planeje sua viagem

Encontre a melhor rota em todas as linhas

Abrir planejador
Metrô de Pequim Line 5 — All 16 Stations, Map & Route Guide | MetroFare