Line 2Bengaluru Metro · BMRCL

Green Line

MadavaraSilk Institute · North-south corridor. Interchanges with Purple Line at Majestic and Yellow Line at Rashtreeya Vidyalaya Road.

32
33.46 km
총 길이
2014
개통 연도
~77 min
전 구간 시간
이 노선에서 경로 계획

32 역

Madavara종점
⬆ ELZ1+0 min
2.5 분 · 1.1 km
Chikkabidarakallu
⬆ ELZ1+2.5 min
2.5 분 · 1.1 km
Manjunathanagara
⬆ ELZ1+5 min
2.5 분 · 1.1 km
Nagasandra
⬆ ELZ1+7.5 min
2.5 분 · 1.1 km
Dasarahalli
⬆ ELZ1+10 min
2.5 분 · 1.1 km
Jalahalli
⬆ ELZ1+12.5 min
2.5 분 · 1.1 km
Peenya Industry
⬆ ELZ1+15 min
2.5 분 · 1.1 km
Peenya
⬆ ELZ1+17.5 min
2.4 분 · 1.1 km
Goraguntepalya
⬆ ELZ1+19.9 min
2.5 분 · 1.1 km
Yeshwanthpur
⬆ ELZ1+22.4 min
2.5 분 · 1.1 km
Sandal Soap Factory
⬆ ELZ1+24.9 min
2.5 분 · 1.1 km
Mahalakshmi
⬆ ELZ1+27.4 min
2.5 분 · 1.1 km
Rajajinagar
⬆ ELZ1+29.9 min
2.5 분 · 1.1 km
Mahakavi Kuvempu Road
⬆ ELZ1+32.4 min
2.5 분 · 1.1 km
Srirampura
⬆ ELZ1+34.9 min

소개 Green Line

Green Line(Line 2)는 Madavara부터 Silk Institute까지 33.46km를 운행하며 32개 역에 서비스를 제공합니다. North-south corridor. Interchanges with Purple Line at Majestic and Yellow Line at Rashtreeya Vidyalaya Road.

이 노선은 2014에 개통했습니다. 전 구간은 약 77분 소요됩니다. 32개 역 중 3개가 지하, 29개가 고가이며, 4개 환승역이 광역 네트워크와 연결됩니다.

자주 묻는 질문

Green Line 한눈에

노선 번호Line 2
32
길이33.46 km
개통2014-03-01
종류표준궤
전철화750 V DC third rail
일일 이용객360,000
단계단계 1_and_2

여정 계획하기

전 노선에서 최적 경로 찾기

경로 플래너 열기
벵갈루루 메트로 Green Line — All 32 Stations, Map & Route Guide | MetroFare