SakherbazarSatyajit Ray
9 分3 駅₹10Kolkata Metro
← ルヌトを蚈画

Sakherbazar 到着 Satyajit Ray

ShortestShortest Route
Sakherbazar
のりば 1·elevated·Purple Line方面 Majerhat
始発: 05:00終電: 23:00Doors open: right
Behala Chowrasta
+2.92 分
2.92 分 · 1.33 km
Behala Bazar
+5.84 分
2.92 分 · 1.33 km
Taratala
Arrive Platform 1·elevated4 km
始発: 05:00終電: 23:00

Last-mile connection needed

Bus / Auto / Taxi/Cab

No metro line directly serves Satyajit Ray. Take the metro to Taratala, then catch a Bus, Auto, Taxi/Cab for the remaining 7.85 km (≈29 min) to reach Satyajit Ray.

Taratala → Satyajit Ray7.85 km≈29 min

Route on the map

出発到着

行皋の抂芁

9 分
Total time
3
駅
4 km
Distance
0
Interchanges

始発・終電

Station始発終電
Sakherbazar05:0023:00
Satyajit Ray05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

運賃ずICカヌド

Token fare
₹10
Buy at counter or TVM
ICカヌド
₹9
Save ₹1 per ride
Off-peak smart card
₹9
Save ₹1 per ride
Use your Kolkata Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

゚コな移動

0.54 kg
CO₂ saved
vs driving a car
0.25 L
Fuel saved
petrol equivalent
~16 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

費甚の比范

Metro
₹10
Bike
₹34
Auto
₹78
Cab
₹138

Estimates for 4 km. Metro is fare-per-person; auto/cab can be shared.

よくある質問

人気のルヌト

Departure station

Sakherbazar

elevated
Sakherbazar, Kolkata, West Bengal
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 1 · 2 entry points
èš­å‚™
LiftsEscalatorsToiletsDrinking water
Arrival station

Satyajit Ray

elevated
Satyajit Ray, Kolkata, West Bengal
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 1 · 2 entry points
èš­å‚™
LiftsEscalatorsToiletsDrinking water

Advertisement

Sakherbazar to Satyajit Ray Metro — 3 stops, 9 min, ₹10 | MetroFare