SrirampuraPeenya Industry
20 分8 駅₹37Bengaluru Metro
← ルヌトを蚈画

Srirampura 到着 Peenya Industry

ShortestShortest Route
Srirampura
のりば 2·elevated·Green Line方面 Madavara
始発: 05:00終電: 23:00Doors open: right
Mahakavi Kuvempu Road
+2.46 分
2.46 分 · 1.08 km
Rajajinagar
+4.92 分
2.46 分 · 1.08 km
Goraguntepalya
+14.76 分
2.46 分 · 1.08 km
Peenya
orange 乗換
+17.21 分
2.45 分 · 1.07 km
Peenya Industry
Arrive Platform 2·elevated8.63 km
始発: 05:00終電: 23:00

Route on the map

8駅0乗換
BPeenya IndustryPeenyaGoraguntepalyaYeshwanthpurSandal Soap FactoryMahalakshmiRajajinagarMahakavi Kuvempu RoadASrirampura
出発到着

行皋の抂芁

20 分
Total time
8
駅
8.63 km
Distance
0
Interchanges

始発・終電

Station始発終電
Srirampura05:0023:00
Peenya Industry05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

運賃ずICカヌド

Token fare
₹37
Buy at counter or TVM
ICカヌド
₹35
Save ₹2 per ride
Off-peak smart card
₹35
Save ₹2 per ride
Use your Bengaluru Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

゚コな移動

1.17 kg
CO₂ saved
vs driving a car
0.54 L
Fuel saved
petrol equivalent
~35 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

費甚の比范

Metro
₹37
Bike
₹62
Auto
₹134
Cab
₹240

Estimates for 8.63 km. Metro is fare-per-person; auto/cab can be shared.

よくある質問

人気のルヌト

Departure station

Srirampura

elevated
Srirampura, Bengaluru, Karnataka
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 1 · 3 entry points
èš­å‚™
LiftsEscalatorsToiletsDrinking water
Arrival station

Peenya Industry

elevated
Peenya Industry, Bengaluru, Karnataka
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 1 · 3 entry points
èš­å‚™
LiftsEscalatorsToiletsDrinking water

Advertisement

Srirampura to Peenya Industry Metro — 8 stops, 20 min, ₹37 | MetroFare