LalbaghPeenya Industry
34 分14 駅₹53Bengaluru Metro
← ルヌトを蚈画

Lalbagh 到着 Peenya Industry

ShortestShortest Route
Lalbagh
のりば 2·elevated·Green Line方面 Madavara
始発: 05:00終電: 23:00Doors open: right
National College
+2.46 分
2.46 分 · 1.08 km
Krishna Rajendra Market
+4.92 分
2.46 分 · 1.08 km
Goraguntepalya
+29.52 分
2.46 分 · 1.08 km
Peenya
orange 乗換
+31.97 分
2.45 分 · 1.07 km
Peenya Industry
Arrive Platform 2·elevated15.11 km
始発: 05:00終電: 23:00

Route on the map

14駅0乗換
Nadaprabhu Kempegowda Station, MajesticBPeenya IndustryPeenyaGoraguntepalyaYeshwanthpurSandal Soap FactoryMahalakshmiRajajinagarMahakavi Kuvempu RoadSrirampuraMantri Square Sampige RoadChickpeteKrishna Rajendra MarketNational CollegeALalbagh
出発到着

行皋の抂芁

34 分
Total time
14
駅
15.11 km
Distance
0
Interchanges

始発・終電

Station始発終電
Lalbagh05:0023:00
Peenya Industry05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

運賃ずICカヌド

Token fare
₹53
Buy at counter or TVM
ICカヌド
₹50
Save ₹3 per ride
Off-peak smart card
₹50
Save ₹3 per ride
Use your Bengaluru Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

゚コな移動

2.04 kg
CO₂ saved
vs driving a car
0.94 L
Fuel saved
petrol equivalent
~60 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

費甚の比范

Metro
₹53
Bike
₹100
Auto
₹212
Cab
₹382

Estimates for 15.11 km. Metro is fare-per-person; auto/cab can be shared.

よくある質問

人気のルヌト

Departure station

Lalbagh

elevated
Lalbagh, Bengaluru, Karnataka
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 2 · 3 entry points
èš­å‚™
LiftsEscalatorsToiletsDrinking water
Arrival station

Peenya Industry

elevated
Peenya Industry, Bengaluru, Karnataka
Weekdays: 05:00 – 23:00(Sundays from 05:00)
Zone 1 · 3 entry points
èš­å‚™
LiftsEscalatorsToiletsDrinking water

Advertisement

Lalbagh to Peenya Industry Metro — 14 stops, 34 min, ₹53 | MetroFare