Bukit BatokJurong East
5 دقيقة1 محطاتS$1.19Singapore MRT
خطط لمسار

Bukit Batok إلى Jurong East

ShortestShortest Route
Bukit Batok
الرصيف 2·elevated·North-South Lineباتجاه Jurong East
أول قطار: 05:00آخر قطار: 23:00Doors open: right
Jurong East
green تحويل
Arrive Platform 1·elevated2.59 km
أول قطار: 05:30آخر قطار: 00:00

Route on the map

1محطات0تبديلات
BJurong EastABukit Batok
منإلى

الرحلة بلمحة

5 دقيقة
Total time
1
محطات
2.59 km
Distance
0
Interchanges

أول وآخر قطار

Stationأول قطارآخر قطار
Bukit Batok05:0023:00
Jurong East05:3000:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

الأسعار والبطاقة

Token fare
S$1.19
Buy at counter or TVM
بطاقة ذكية
S$1.09
Save S$0.1 per ride
Off-peak smart card
S$1.09
Save S$0.1 per ride
Use your Singapore MRT smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

تنقل صديق للبيئة

0.35 kg
CO₂ saved
vs driving a car
0.16 L
Fuel saved
petrol equivalent
~10 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

مقارنة التكلفة

Metro
S$1.19
Bike
S$26
Auto
S$62
Cab
S$106

Estimates for 2.59 km. Metro is fare-per-person; auto/cab can be shared.

الأسئلة الشائعة

المسارات الشائعة

Departure station

Bukit Batok

elevated
Bukit Batok, Singapore
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 2 entry points
المرافق
LiftsEscalatorsToiletsDrinking water
Arrival station

Jurong East

elevated
Jurong East, Singapore
Weekdays: 05:3000:00(Sundays from 05:30)
Zone 1 · 4 entry points
Key exits
1
Jurong East exit A· Jurong East, Westgate
2
Jurong East exit B· Jurong East, Westgate
3
Jurong East exit C· Jurong East, Westgate
4
Jurong East exit D· Jurong East, Westgate
Tap in and out with an EZ-Link or SimplyGo card; eating and drinking are not allowed on trains.
المرافق
LiftsEscalatorsToiletsDrinking waterATMConvenience store

Advertisement

Bukit Batok to Jurong East Metro — 1 stops, 5 min, S$1.19 | MetroFare