Dum DumNetaji
47 دقيقة17 محطات₹30Kolkata Metro
خطط لمسار

Dum Dum إلى Netaji

ShortestShortest Route
Dum Dum
الرصيف 1·elevated·Blue Lineباتجاه Kavi Subhash
أول قطار: 05:00آخر قطار: 23:00Doors open: right
Belgachhia
+2.77 دقيقة
2.77 دقيقة · 1.25 km
Shyambazar
+5.56 دقيقة
2.79 دقيقة · 1.26 km
Rabindra Sarobar
+41.73 دقيقة
2.79 دقيقة · 1.26 km
Mahanayak Uttam Kumar
+44.5 دقيقة
2.77 دقيقة · 1.25 km
Netaji
Arrive Platform 1·elevated21.35 km
أول قطار: 05:00آخر قطار: 23:00

Route on the map

17محطات0تبديلات
ADum DumBelgachhiaShyambazarShovabazar–SutanutiGirish ParkMahatma Gandhi RoadCentralChandni ChowkEsplanadePark StreetMaidanRabindra SadanNetaji BhavanJatin Das ParkKalighatRabindra SarobarMahanayak Uttam KumarBNetaji
منإلى

الرحلة بلمحة

47 دقيقة
Total time
17
محطات
21.35 km
Distance
0
Interchanges

أول وآخر قطار

Stationأول قطارآخر قطار
Dum Dum05:0023:00
Netaji05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

الأسعار والبطاقة

Token fare
30
Buy at counter or TVM
بطاقة ذكية
27
Save ₹3 per ride
Off-peak smart card
27
Save ₹3 per ride
Use your Kolkata Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

تنقل صديق للبيئة

2.88 kg
CO₂ saved
vs driving a car
1.32 L
Fuel saved
petrol equivalent
~85 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

مقارنة التكلفة

Metro
₹30
Bike
₹138
Auto
₹286
Cab
₹520

Estimates for 21.35 km. Metro is fare-per-person; auto/cab can be shared.

الأسئلة الشائعة

المسارات الشائعة

Departure station

Dum Dum

elevated
Dum Dum, Kolkata, West Bengal
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 2 entry points
المرافق
LiftsEscalatorsToiletsDrinking water
Arrival station

Netaji

elevated
Netaji, Kolkata, West Bengal
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 1 · 2 entry points
المرافق
LiftsEscalatorsToiletsDrinking water

Advertisement

Dum Dum to Netaji Metro — 17 stops, 47 min, ₹30 | MetroFare