Central Silk BoardInfosys Foundation Konappana Agrahara
23 دقيقة8 محطات₹42Bengaluru Metro
خطط لمسار

Central Silk Board إلى Infosys Foundation Konappana Agrahara

ShortestShortest Route
Central Silk Board
blue تحويل
الرصيف 1·elevated·Yellow Lineباتجاه Delta Electronics Bommasandra
أول قطار: 05:00آخر قطار: 23:00Doors open: right
Bommanahalli
+2.81 دقيقة
2.81 دقيقة · 1.27 km
Hongasandra
+5.64 دقيقة
2.83 دقيقة · 1.28 km
Beratena Agrahara
+16.94 دقيقة
2.83 دقيقة · 1.28 km
Electronic City
+19.75 دقيقة
2.81 دقيقة · 1.27 km
Infosys Foundation Konappana Agrahara
Arrive Platform 1·elevated10.21 km
أول قطار: 05:00آخر قطار: 23:00

Route on the map

8محطات0تبديلات
ACentral Silk BoardBommanahalliHongasandraKudlu GateSingasandraHosa RoadBeratena AgraharaElectronic CityBInfosys Foundation Konappana Agrahara
منإلى

الرحلة بلمحة

23 دقيقة
Total time
8
محطات
10.21 km
Distance
0
Interchanges

أول وآخر قطار

Stationأول قطارآخر قطار
Central Silk Board05:0023:00
Infosys Foundation Konappana Agrahara05:0023:00
Weekday timings. On Sundays & public holidays, first trains run ~30 min later. Frequency: every 2-4 min (peak), 5-8 min (off-peak).

الأسعار والبطاقة

Token fare
42
Buy at counter or TVM
بطاقة ذكية
40
Save ₹2 per ride
Off-peak smart card
40
Save ₹2 per ride
Use your Bengaluru Metro smart card or QR ticketwhere supported by the operator, app, or station counter.
Fare guide

Advertisement

تنقل صديق للبيئة

1.38 kg
CO₂ saved
vs driving a car
0.63 L
Fuel saved
petrol equivalent
~41 min
Rush-hour saved
vs road traffic
~70 kcal
Calories burned
walking to platform

مقارنة التكلفة

Metro
₹42
Bike
₹72
Auto
₹152
Cab
₹274

Estimates for 10.21 km. Metro is fare-per-person; auto/cab can be shared.

الأسئلة الشائعة

المسارات الشائعة

Departure station

Central Silk Board

elevated
Central Silk Board, Bengaluru, Karnataka
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 2 · 6 entry points
Interchange with blue line.
المرافق
LiftsEscalatorsToiletsDrinking waterATMParking
Arrival station

Infosys Foundation Konappana Agrahara

elevated
Infosys Foundation Konappana Agrahara, Bengaluru, Karnataka
Weekdays: 05:0023:00(Sundays from 05:00)
Zone 2 · 3 entry points
المرافق
LiftsEscalatorsToiletsDrinking water

Advertisement

Central Silk Board to Infosys Foundation Konappana Agrahara Metro — 8 stops, 23 min, ₹42 | MetroFare